Assembling a 4,500T Chemical Tanker with <0.2mm Precision Using KIET's 3D Adjustment Hydraulic Equipment
2026-04-20
Summary
To facilitate the construction of a new 4,500T chemical tanker, KIET provided the client with four PLC-controlled, 200-ton 3D Adjustment Hydraulic Equipment, successfully solving the critical challenge of high-precision hull block joining.
The Challenge

The primary challenge was the assembly of a new 4,500-ton chemical tanker, a vessel type that demands exceptional structural integrity and adherence to strict safety standards. The client needed a method to join massive, 200-ton hull blocks with a precision under 0.2mm to ensure a flawless and efficient construction process for this specific vessel.
The Solution

KIET engineered and delivered a turnkey solution featuring four heavy-duty 3D Adjustment Hydraulic Equipments, specifically configured for the chemical tanker assembly line. Key features of the solution included:

PLC Computer Control
A sophisticated, centralized system for synchronized and precise operation.
200-Ton Lifting Capacity
Robust power to handle the large-scale hull segments of the 4,500T vessel.
3-Axis (X, Y, Z) Adjustment
Fine-tuned directional control for perfect alignment.

The Result
The implementation of KIET's systems was a resounding success for the chemical tanker project. The primary goal of achieving a positioning accuracy of less than 0.2mm was consistently met, a critical benchmark for quality in modern shipbuilding.