Large tonnage jack is used for dam gate maintenance

We often use large-tonnage jacks as our lifting tools in the maintenance process of dam gates. Large-tonnage jacks are generally used in large-load situations, and are widely used in today's industry for operations in the form of lifting, lowering, pushing, and pressing. The newly shipped CLRG-200T double-acting large-tonnage jack is used by a Guangxi customer for dam maintenance.

The material of the dam gate is made of high-strength steel, and the pier reinforced concrete structure, as an important facility of the reservoir, can be used as an effective management and control of river ships. Generally, the principle of priority priority, first-come-first-served, efficiency and reasonable regulation is followed. As an important gate for monitoring the water flow in the upstream and downstream of the river, its importance is self-evident. Generally, it needs to be overhauled regularly and planned to ensure the reliability and safety of the upstream and downstream water flow.

Here we take the large-tonnage jack purchased by the customer as an example to introduce the process of dam maintenance. CLRG-200T double-acting large tonnage jack has a rated load of 200 tons, a stroke of 300mm, and a height of 465mm. When used with a 2.2KW electric pump, only 2 oil pipes are needed to connect.

Select the appropriate supporting pump station for the large-tonnage jack. When using it, you should strictly abide by the regulations in the main parameters. You must remember that it cannot be super high and overloaded. Otherwise, the lifting height and lifting tonnage will exceed the specified requirements. The top of the cylinder will start leaking when it weighs. Before operating the electric pump, please read the operating regulations on the manual, and operate according to the regulations.

As a simple gate maintenance tool, the large-tonnage jack has a huge lifting force, a very simple structure, and is easy to handle. When using, first place the jack in the center of the gate, install the upper and lower cavity pressure sensors to detect the pressure, and the displacement sensor to detect the stroke. The flow of the pump station is controlled by the variable frequency motor to realize the adjustment of the lifting speed, and then the programmable logic control system is completed. Various human-computer interactions. During the lifting period, it is necessary to ensure that the lifting height of each roof is as high as possible to achieve synchronous lifting.

Jiangsu Canete Machinery Equipment Manufacturing Co., Ltd. is committed to providing engineering solutions in the fields of heavy load, high-precision control, multi-logic action, and multi-point control. Provide customers with large tonnage jacks and high-voltage electric pump stations, welcome to inquire. 