Why Choose Strand Jacks for Suspension Bridge Construction?

2026-10-08

We help bridge teams choose lifting equipment when restricted waterways and deep valleys rule out familiar options. The wrong system can leave a heavy girder waiting.

At KIET Hydraulics, we supply strand jack systems for projects where access, load holding, and synchronized movement matter. These systems combine compact lifting units, mechanical strand gripping, and centralized control. For suspension bridge steel box girders, they offer an alternative when conventional lifting arrangements are impractical.

KIET cable-mounted strand jack lifting a steel box girder for suspension bridge construction.

KIET cable-mounted strand jack lifting a steel box girder for suspension bridge construction.

We manufacture equipment and support selection; the project team manages construction. Our focus is how equipment features address your bridge's access, safety, and positioning challenges.

How Do Strand Jacks Overcome Difficult Site Access?

We consider access before lifting capacity. A crane may carry the required load yet still lack the water depth, clearance, or space to reach it.

We offer compact strand jacks that lift from engineered overhead supports. On suspension bridges, approved cable-mounted frames can carry these units. This arrangement avoids reliance on a floating crane's boom reach and can reduce the need for temporary supports below the girder.

KIET cable-mounted strand jack lifting a steel box girder for suspension bridge construction.

KIET cable-mounted strand jack lifting a steel box girder for suspension bridge construction.

We Match the Equipment to the Site

Floating cranes remain useful where access and lifting charts permit. We focus on strand jacks when those conditions fail.

Alternative Site constraint we help customers assess
Floating crane Shallow water, low transit clearance, or restricted working space can prevent access.
Temporary supports River traffic, difficult foundations, and valley depth can make supports impractical.
Incremental launching The deck and support arrangement must suit horizontal movement.
Long Travel Does Not Require a Long Boom

Our systems use repeated gripping and lifting cycles, so cylinder stroke does not set total lifting distance. We match strand length and handling arrangements to the required travel.

The bridge engineer must approve main-cable loads and support connections. We also account for equipment access; girder delivery and weather restrictions still need project planning.

How Does Mechanical Gripping Improve Load Holding?

We understand why suspended-load safety drives equipment decisions. If power stops during a lift, the system needs a defined way to hold the girder.

Our strand jacks use upper and lower wedge anchors to grip the steel strands. These anchors work in sequence with the hydraulic cylinder. Mechanical gripping supports secure holding between movements, while the selected system's hydraulic protection and controls govern safe stopping and lowering.

Overall view of suspension bridge construction site utilizing hydraulic lifting systems.

Overall view of suspension bridge construction site utilizing hydraulic lifting systems.

We Build Around a Different Holding Principle

A winch-based cable crane winds wire rope onto a drum and uses braking systems. Our strand jacks move along steel strands and hold through wedge anchors. Both can form part of cable-mounted lifting equipment.

This mechanical holding principle is central to the equipment's value, not a claim that every winch system is unsafe.

Feature Why it matters for your project
Wedge anchors They grip the strands mechanically during holding.
Coordinated anchor operation It allows repeated lifting and lowering cycles.
Centralized control It brings multiple lifting units under one control system.
We Keep Safety Claims Specific

For power-loss protection, we distinguish stationary holding from stopping during an active stroke. The anchor design, hydraulic circuit, and control sequence must work together. Correct strand selection and wedge inspection remain essential.

How Can Synchronized Strand Jacks Improve Girder Alignment?

We focus on coordinated movement because uneven lifting can tilt a steel box girder. That tilt can complicate positioning and change loads at individual points.

Our synchronized systems coordinate multiple jacks from a central control point. This helps manage relative movement during steel box girder lifting. We match the control configuration to the project's feedback and tolerance requirements, so the equipment supports positioning rather than relying on separate manual adjustments.

Final alignment of steel box girder on a suspension bridge using KIET synchronized hydraulic systems.

Final alignment of steel box girder on a suspension bridge using KIET synchronized hydraulic systems.

We Define Precision Around the Project

For millimeter-level requirements, we agree on measurable tolerances and acceptance conditions. Sensor resolution alone does not establish girder positioning accuracy. Strand stretch, support movement, and independent survey measurements also matter during final alignment.

We Turn Project Inputs into Equipment Choices

We help customers select from our  strand jack systems using the engineer's load and layout information.

Project input Equipment choice we help assess
Girder weight and center of gravity We assess capacity requirements at each lifting point.
Lifting height and support space We assess strand travel and equipment dimensions.
Lifting-point layout and tolerances We assess synchronized control and feedback requirements.

We welcome these details before recommending a configuration. This keeps the discussion focused on your bridge, not just a catalog capacity.

Conclusion

We supply strand jacks to address difficult access, mechanical load holding, and coordinated girder movement. We help match the equipment to your bridge project's requirements.