2025 Applications Review: Proven Hydraulic Systems Supporting Complex Heavy-Load Projects Worldwide

2026-01-16

2025 was a year of accelerated upgrades for heavy jacking, pushing, lifting and transport. As the market shifts toward higher quality and safer execution, KIET HYDRAULICS (Jiangsu Canete Machinery) continued to focus on heavy jacking, pushing, hoisting and moving solutions. Guided by project needs, we advanced product iterations and system optimization, and our hydraulic equipment was applied and validated across multiple engineering projects.

2025 Review: Building on Technology, Proving Capability with Real Cases

Over the past year, we concentrated on four core segments. With precise control and safe, efficient equipment, our teams overcame successive technical challenges and left solid footprints in key projects.

Bridge sector: technology enabling renewal

China’s bridge industry faces dual tasks: upgrading aging bridge girders and replacing or reconstructing some bridges due to new urban planning. At this pivotal stage, KIET HYDRAULICS followed market demand, drove innovation, and focused on R&D and application of synchronized jacking systems. Leveraging breakthrough results with incremental pad-lifting technology, we helped speed up renewal in real projects.

Compared with traditional jacking schemes, KIET’s Hydraulic Jack-up Systems demonstrated high precision, high efficiency and high safety across multiple bridge jobs, showing strong technical competence and industry value.

Project highlights in 2025 (bridge)

  • Guangdong Huizhou urban cross-road bridge girder demolition • Total weight: 3,200 t; total length: 110 m

KIET's hydraulic jacking system used in the 3,200t Huizhou cross-road bridge girder demolition project

  • Xinjiang’s first modular rapid bridge dismantling

The first modular rapid bridge dismantling in Xinjiang, supported by KIET's hydraulic equipment.

  • G30 Lianhuo Expressway separated interchange bridge rapid dismantling

Rapid dismantling of the G30 Lianhuo Expressway interchange bridge using a synchronized jacking system.

Demolition and reconstruction of the Shiziyang Channel old bridge in the Greater Bay Area.

  • Cross-line interchange bridge synchronized jacking project

A multi-point synchronized jacking project on a cross-line interchange bridge.

  • Beijing–Shanghai railway beam synchronized jacking, lateral sliding and steel bearing replacement

Synchronized jacking and lateral sliding for steel bearing replacement on the Beijing-Shanghai railway.

Our technical schemes addressed the challenges of renewing old bridges and promoted efficient reuse of existing bridge resources, offering a greener, economical and efficient path for urban infrastructure renewal.

Construction and Special Structures: Case Studies

  • Fujian Construction Science project: Aiguo Overseas Chinese Residence relocation (leveling and sliding)

Aiguo Overseas Chinese Residence building relocation project, featuring hydraulic leveling and sliding.

  • Hong Kong swimming hall: upper space-frame long-distance jacking/pushing installation

Long-distance jacking and pushing installation of a space-frame at the Hong Kong swimming hall.

  • 2,400 t Shakyamuni Buddha statue: synchronous liftingto final installation elevation

Synchronous lifting of a 2,400t Shakyamuni Buddha statue to its final installation elevation.

Offshore and Petrochemical: Heavy Lifting & Weighing Projects

  • ~4,000 t offshore oil platform weighingproject

A ~4,000t offshore oil platform weighing project using KIET's precision hydraulic weighing system.

  • ~10,000 t offshore module synchronous weighing

Synchronous weighing of a ~10,000t offshore module to verify weight and center-of-gravity.

Shipbuilding and LNG: Precision & Relocation Solutions

  • Dalian shipyard: A-type ship block installation surface precise leveling

Precise surface leveling for A-type ship block installation at Dalian shipyard using KIET hydraulics.

Relocation of an LNG storage tank using KIET's intelligent heavy-load transfer trolleys.

Metallurgy Sector: Plant Modernization Applications

  • Baowu Steel Group steelmaking plant: travelling beam replacementproject using incremental pad lifting

Incremental pad lifting technology used for travelling beam replacement at Baowu Steel Group's plant.

Power and Hydropower: Equipment Installation & Maintenance

A 600t main transformer moved into final position via synchronized jacking and a skidding system.

Intelligent hydraulic equipment for runner blade bolt disassembly at the Three Gorges Hydropower Station.

Our Typical Deliverables and Process

  • Method concept and equipment configuration aligned to weights, geometry and access
  • Controls and synchronization scheme with real-time monitoring and alarms
  • Commissioning and operator training; on-site calibration to meet time windows

When to Consider KIET's Hydraulic Systems

  • Limited access or low headroom under decks or inside plants
  • Long-span, multi-point lifts requiring uniform elevation
  • Horizontal repositioning (slide-in/out) where crane reach is impractical
  • Weight and center-of-gravity verification before transport or lift

2026 Outlook: Partner with KIET for Your Next Project

We will continue to cultivate hydraulic technology and supply smarter, more precise and more reliable equipment to support more projects and industry progress. For upcoming work involving bridge renewal, bearing changes, module weighing, transformer installation or heavy-component moves, share basic geometry, weights, access constraints and schedule. Our engineering team will return a practical concept and configuration.